AFEX

Monoblock Automatic 5-10L Water Filling Machine 4-4-1

Individual offer
Price

Overview

About the equipment

Features of the Equipment:

Washing Process:

  • The “clip bottleneck” method is used for washing bottle parts.

  • The bottle rotates 180°, ensuring high-efficiency cleaning.

Filling Process:

  • A flat surface filling system is used, ensuring reliable filling quality and fast filling speed.

Control Mechanism:

  • An automatic liquid level control system is implemented for precision and efficiency.

Hydraulic Cylinder and Valve:

  • The hydraulic cylinder, in contact with the flat-surface filling valve, is made of high-quality stainless steel.

  • It is corrosion-resistant, easy to clean, and meets industrial health standards.

 

Main Technical Specifications

Model: 4-4-1

Filling Volume: 3L–10L

Production Capacity:

  • For 5L: 500–600 bottles/hour

  • For 10L: 200–300 bottles/hour

Power Supply: 380V, 50Hz, 3P

Power Consumption: 4 kW

Conveyor Motor: 0.75 kW

Air Supply & Consumption: 0.5–0.6 MPa, 350 L/min

Structure Type: Gear-driven roller transmission & chain capping system

Water Filling Machine Dimensions: 3100×1550×2000 mm

Cap Loading Machine Dimensions: 800×800×2700 mm

Weight: 900 kg

AFEX · CONSULTATION
Operators online

Quick price request

Leave your name and phone number — our specialist will take care of the rest.

EquipmentMonoblock Automatic 5-10L Water Filling Machine 4-4-1

Your data is never shared with third parties

Included units

Units and accessories included with the equipment. Specifications for each are in the section above.

  • Machine Components

    3 items

    1. 1Washing Unit
    2. 2Filling Unit
    3. 3Capping Unit

Video

The equipment in operation.

Delivery and commissioning

From consultation to launch — four steps under contract.

  1. 1

    Consultation

    We define your needs, configure the line and prepare an offer.

  2. 2

    Contract

    Timeline, payment terms and warranty are fixed in the contract.

  3. 3

    Delivery

    The equipment is delivered from the manufacturer to your site.

  4. 4

    Installation and training

    Our specialists commission the equipment and train your operators.

Frequently asked questions

The most common questions about delivery, contracts and tracking.

Is it possible to track my orders online?
You can track orders online. Uzbekistan was one of the first to develop a mechanism for monitoring cargo, determining their location, and estimating the time of arrival using the GPS system. You can get this information only by entering the contract number.
How long will the shipments be delivered?
Delivery time depends on the manufacturer in most cases. Most large-scale production equipment takes 2-3 times longer to deliver than normal equipment. In the case of ready-made equipment, the delivery period starts from 30 days. Excluding the time required for customs clearance of equipment in the territory of Uzbekistan, certification processes.
What are the shipping methods available?
According to the type of goods from abroad and the period when the order was received, the goods are delivered to the territory of Uzbekistan on the following basis: By air By rail By land transport By mixed transport
What is required of me to conclude a contract?
To become a client of our company, you must: CERTIFICATE certifying the business entity; Bank details; STIR number; Copy of the manager's passport; Enterprise seal to confirm the contract
Consultation

Let’s discuss your project together

Contact us for advice on choosing equipment, technical solutions and offers.

Call us+998 93 381 6699Mon–Sat: 9:00 – 18:00
AFEX · SOCIAL

Follow our channels

New equipment, commissioning and production footage — on our official channels.

Related equipment

View all