1 / 5Overview
About the equipment
The small plate and frame filter press machine offered by China advanced oil equipment manufacturer is mainly composed of filter plate, frame, tension bolt, oil pump, motor, etc. In order to make installation and operation convenient and convenient, each set of filter press machine is an oil pump and a main motor, so there is no need to prepare it, it is assembled, which saves costs and effort. Also, this plate and frame filter press machine has been upgraded with a new stainless steel oil drop pan, which makes the oil cleaner and more convenient to operate. As for the filter cloth, you can order according to your capacity and requirements according to the size. The filter cloth is sold together with the equipment and additional cloth must be paid separately by the buyer.
AFEX · CONSULTATION
Operators onlineQuick price request
Leave your name and phone number — our specialist will take care of the rest.
Your data is never shared with third parties
Delivery and commissioning
From consultation to launch — four steps under contract.

Consultation
We define your needs, configure the line and prepare an offer.

Contract
Timeline, payment terms and warranty are fixed in the contract.

Delivery
The equipment is delivered from the manufacturer to your site.

Installation and training
Our specialists commission the equipment and train your operators.
Frequently asked questions
The most common questions about delivery, contracts and tracking.
Is it possible to track my orders online?
You can track orders online. Uzbekistan was one of the first to develop a mechanism for monitoring cargo, determining their location, and estimating the time of arrival using the GPS system. You can get this information only by entering the contract number.
How long will the shipments be delivered?
Delivery time depends on the manufacturer in most cases. Most large-scale production equipment takes 2-3 times longer to deliver than normal equipment. In the case of ready-made equipment, the delivery period starts from 30 days. Excluding the time required for customs clearance of equipment in the territory of Uzbekistan, certification processes.
What are the shipping methods available?
According to the type of goods from abroad and the period when the order was received, the goods are delivered to the territory of Uzbekistan on the following basis:
By air
By rail
By land transport
By mixed transport
What is required of me to conclude a contract?
To become a client of our company, you must:
CERTIFICATE certifying the business entity;
Bank details;
STIR number;
Copy of the manager's passport;
Enterprise seal to confirm the contract
Consultation
Let’s discuss your project together
Contact us for advice on choosing equipment, technical solutions and offers.
AFEX · SOCIAL
Follow our channels
New equipment, commissioning and production footage — on our official channels.
Related equipment

Paper processing
Automatic 6-line wet wipes production line (30-120 pieces)
Details →

Turnkey production lines
Antifreeze production line
Details →

Oil pressing equipment
Seed roasting equipment
Details →

Oil pressing equipment
Oil dewaxing (winterization) equipment
Details →

Turnkey production lines
linoleum production line
Details →

Oil pressing equipment
Refining and degumming equipment
Details →
In stockOil pressing equipment
Oil filter AF380
Details →
In stockOil pressing equipment
Steam generator (steam boiler)
Details →