AFEX
Food equipmentProduct code: 675bdc1686b0c03ad05b393d

Data Matrix Labeling Machine for Bottle Caps

This machine is designed to be installed on a conveyor for automatically applying Data Matrix labels to water bottles.

Individual offer
Price

Overview

About the equipment

This machine is designed to be installed on a conveyor for automatically applying Data Matrix labels to water bottles. With high precision and fast operation, it simplifies the labeling process. It is compatible with various product sizes and ensures accurate positioning. An ideal solution for automating production and increasing efficiency!

Data Matrix Labeling Machine for Bottle Caps

Voltage: 220V, 50Hz
Speed: 40-120 pieces/min
Accuracy: ±1 mm

Compatible Product Size:

✔ 10 mm – 150 mm

Compatible Label Size:

✔ Length: 6 mm – 300 mm
✔ Width: 25 mm – 125 mm

Label Roll Specifications:

✔ Inner Diameter: ⌀76 mm
✔ Outer Diameter: ⌀280 mm

Machine Specifications:

✔ Dimensions: 885x870x1535 mm
✔ Weight: 76 kg

AFEX · CONSULTATION
Operators online

Quick price request

Leave your name and phone number — our specialist will take care of the rest.

EquipmentData Matrix Labeling Machine for Bottle Caps

Your data is never shared with third parties

Delivery and commissioning

From consultation to launch — four steps under contract.

  1. 1

    Consultation

    We define your needs, configure the line and prepare an offer.

  2. 2

    Contract

    Timeline, payment terms and warranty are fixed in the contract.

  3. 3

    Delivery

    The equipment is delivered from the manufacturer to your site.

  4. 4

    Installation and training

    Our specialists commission the equipment and train your operators.

Frequently asked questions

The most common questions about delivery, contracts and tracking.

Is it possible to track my orders online?
You can track orders online. Uzbekistan was one of the first to develop a mechanism for monitoring cargo, determining their location, and estimating the time of arrival using the GPS system. You can get this information only by entering the contract number.
How long will the shipments be delivered?
Delivery time depends on the manufacturer in most cases. Most large-scale production equipment takes 2-3 times longer to deliver than normal equipment. In the case of ready-made equipment, the delivery period starts from 30 days. Excluding the time required for customs clearance of equipment in the territory of Uzbekistan, certification processes.
What are the shipping methods available?
According to the type of goods from abroad and the period when the order was received, the goods are delivered to the territory of Uzbekistan on the following basis: By air By rail By land transport By mixed transport
What is required of me to conclude a contract?
To become a client of our company, you must: CERTIFICATE certifying the business entity; Bank details; STIR number; Copy of the manager's passport; Enterprise seal to confirm the contract
Consultation

Let’s discuss your project together

Contact us for advice on choosing equipment, technical solutions and offers.

Call us+998 93 381 6699Mon–Sat: 9:00 – 18:00
AFEX · SOCIAL

Follow our channels

New equipment, commissioning and production footage — on our official channels.

Related equipment

View all