1 / 67th Generation Socks Production Line
300-360rpm · 220V/1.1kw/h · 30l
- Knitting speed
- 300-360rpm
- Voltage and power consumption
- 220V/1.1kw/h
- Capacity
- 30l
- Size
- 1500x1200x2400mm
- Cylinder size
- 3,75
- Motor type
- Inverter+Turbo function
Quick price request
Leave your name and phone number — our specialist will take care of the rest.
Your data is never shared with third parties
Specifications
Data provided by the manufacturer; configuration may vary per order.
Sock knitting equipment FX-7FTP
11 parameters- Produced
- China
- The number of needles
- 84-200 (according to the choice of the buyer)
- Knitting speed
- 300-360rpm
- Display type
- LCD + touchscreen
- Size
- 1500x1200x2400mm
- Cylinder size
- 3,75
- Motor type
- Inverter+Turbo function
- Types of knitting
- Summer/winter
- Daily workload
- 250-320 pairs/day
- Design features
- 3D/selected terry/Jacquard invisible
- Additional amenities
- Pause on thread break detection/error
Air drag device
4 parameters- Voltage and power consumption
- 220V/1.1kw/h
- Air ride
- 80m3/hour
- Vacuum
- -1109(mbar)
- Weight
- 11 kg
Special overlock
4 parameters- Voltage and power consumption
- 220V/0.5kw/h
- Number of threads
- 3
- Weight
- 42 kg
- Motor type/speed
- Sevro-12/min
Ironing equipment
4 parameters- Voltage and power consumption
- 220V/2 kw/h
- Number of forms
- 3
- Ironing speed
- 12 min
- Weight
- 18kg
Air compressor
4 parameters- Voltage and power consumption
- 220V/0,5 kw/h
- Capacity
- 30l
- Air pressure
- 8 bar
- Give air
- 0,06m3/min
Included units
Units and accessories included with the equipment. Specifications for each are in the section above.
01Sock knitting equipment FX-7FTP
11 parameters
- Knitting speed: 300-360rpm
- Size: 1500x1200x2400mm
02Air drag device
4 parameters
- Voltage and power consumption: 220V/1.1kw/h
- Air ride: 80m3/hour
03Special overlock
4 parameters
- Voltage and power consumption: 220V/0.5kw/h
- Number of threads: 3
04Ironing equipment
4 parameters
- Voltage and power consumption: 220V/2 kw/h
- Number of forms: 3
05
Delivery and commissioning
From consultation to launch — four steps under contract.

Consultation
We define your needs, configure the line and prepare an offer.

Contract
Timeline, payment terms and warranty are fixed in the contract.

Delivery
The equipment is delivered from the manufacturer to your site.

Installation and training
Our specialists commission the equipment and train your operators.
Frequently asked questions
The most common questions about delivery, contracts and tracking.
Is it possible to track my orders online?
How long will the shipments be delivered?
What are the shipping methods available?
What is required of me to conclude a contract?
Let’s discuss your project together
Contact us for advice on choosing equipment, technical solutions and offers.
Follow our channels
New equipment, commissioning and production footage — on our official channels.
Related equipment

High quality 8 Head Digital Textile Printer for industry
In stockVertical screw powder packaging equipment (3-way)
In stockDispenser with Bunker (mixer and heating function) (100-1000ml)
In stockEquipment for sticking film and foil on top of plastic cups
In stockTwo-chamber vacuum packing equipment DZ-400
In stockTwo-chamber vacuum packing equipment DZ-600
In stockLabeling equipment with PLC control (semi-automatic)
In stock
