AFEX

Noodle and Lagman Making Machine

3 kW · 220–240 kg/hour · 380V

Individual offer
Power
3 kW
Production capacity
220–240 kg/hour
Voltage
380V
Equipment dimensions
1350×650×1400 mm
Weight
550 kg
Roller diameter
138 mm
Price

Overview

About the equipment

01

General

7 parameters
General
Manufacturer
China
Voltage
380V
Power
3 kW
Production capacity
220–240 kg/hour
Roller diameter
138 mm / 250 mm
Equipment dimensions
1350×650×1400 mm
Weight
550 kg

Operating Principle of the Equipment

  1. Dough preparation and rolling – dough made from wheat flour is rolled between two rollers, forming a thin and uniform layer.
  2. Layer structure formation – during rolling, the internal structure of the dough is strengthened, giving the noodles their characteristic taste and elasticity.
  3. Cutting – the resulting thin layers are cut to the desired size with special knives, forming noodles.
AFEX · CONSULTATION
Operators online

Quick price request

Leave your name and phone number — our specialist will take care of the rest.

EquipmentNoodle and Lagman Making Machine

Your data is never shared with third parties

Specifications

Data provided by the manufacturer; configuration may vary per order.

General

7 parameters
Manufacturer
China
Voltage
380V
Power
3 kW
Production capacity
220–240 kg/hour
Roller diameter
138 mm / 250 mm
Equipment dimensions
1350×650×1400 mm
Weight
550 kg

Video

The equipment in operation.

Delivery and commissioning

From consultation to launch — four steps under contract.

  1. 1

    Consultation

    We define your needs, configure the line and prepare an offer.

  2. 2

    Contract

    Timeline, payment terms and warranty are fixed in the contract.

  3. 3

    Delivery

    The equipment is delivered from the manufacturer to your site.

  4. 4

    Installation and training

    Our specialists commission the equipment and train your operators.

Frequently asked questions

The most common questions about delivery, contracts and tracking.

Is it possible to track my orders online?
You can track orders online. Uzbekistan was one of the first to develop a mechanism for monitoring cargo, determining their location, and estimating the time of arrival using the GPS system. You can get this information only by entering the contract number.
How long will the shipments be delivered?
Delivery time depends on the manufacturer in most cases. Most large-scale production equipment takes 2-3 times longer to deliver than normal equipment. In the case of ready-made equipment, the delivery period starts from 30 days. Excluding the time required for customs clearance of equipment in the territory of Uzbekistan, certification processes.
What are the shipping methods available?
According to the type of goods from abroad and the period when the order was received, the goods are delivered to the territory of Uzbekistan on the following basis: By air By rail By land transport By mixed transport
What is required of me to conclude a contract?
To become a client of our company, you must: CERTIFICATE certifying the business entity; Bank details; STIR number; Copy of the manager's passport; Enterprise seal to confirm the contract
Consultation

Let’s discuss your project together

Contact us for advice on choosing equipment, technical solutions and offers.

Call us+998 93 381 6699Mon–Sat: 9:00 – 18:00
AFEX · SOCIAL

Follow our channels

New equipment, commissioning and production footage — on our official channels.

Related equipment

View all