AFEX
Food equipmentProduct code: 6940f1cd63f8460ffa27408b

Garlic Peeling Machine

The HK-300 is professional equipment designed for automatic garlic peeling.

Individual offer
Power
0.2 kW
Capacity
300 kg/h
Model
HK-300
Voltage
220 V
Weight
95 kg
Length
700 mm
Price

Overview

Key advantages

  • Processes up to 300 kg of product per hour
  • Peels garlic cloves without damaging them
  • High peeling quality and consistent results
  • Operates with low energy consumption
  • Stainless steel body is hygienic and durable
  • Easy to use and operate

About the equipment

The HK-300 is professional equipment designed for automatic garlic peeling. It removes the outer skin from garlic cloves quickly and efficiently while preserving the natural shape and quality of the product. The machine is widely used in food processing plants, by semi-finished product manufacturers, in restaurants and in agricultural produce processing workshops. The stainless steel body meets high hygiene requirements and ensures a long service life. With a capacity of up to 300 kg per hour, it can process large volumes of garlic in a short time.

01

General

12 parameters
General
Model
HK-300
Function
Garlic peeling
Power
0.2 kW
Voltage
220 V
Frequency
50 Hz
Capacity
300 kg/h
Weight
95 kg
Length
700 mm
Width
720 mm
Height
1380 mm
Body material
Stainless steel
Operation type
Electric, automatic
AFEX · CONSULTATION
Operators online

Quick price request

Leave your name and phone number — our specialist will take care of the rest.

EquipmentGarlic Peeling Machine

Your data is never shared with third parties

Specifications

Data provided by the manufacturer; configuration may vary per order.

General

12 parameters
Model
HK-300
Function
Garlic peeling
Power
0.2 kW
Voltage
220 V
Frequency
50 Hz
Capacity
300 kg/h
Weight
95 kg
Length
700 mm
Width
720 mm
Height
1380 mm
Body material
Stainless steel
Operation type
Electric, automatic

Video

The equipment in operation.

Delivery and commissioning

From consultation to launch — four steps under contract.

  1. 1

    Consultation

    We define your needs, configure the line and prepare an offer.

  2. 2

    Contract

    Timeline, payment terms and warranty are fixed in the contract.

  3. 3

    Delivery

    The equipment is delivered from the manufacturer to your site.

  4. 4

    Installation and training

    Our specialists commission the equipment and train your operators.

Frequently asked questions

The most common questions about delivery, contracts and tracking.

Is it possible to track my orders online?
You can track orders online. Uzbekistan was one of the first to develop a mechanism for monitoring cargo, determining their location, and estimating the time of arrival using the GPS system. You can get this information only by entering the contract number.
How long will the shipments be delivered?
Delivery time depends on the manufacturer in most cases. Most large-scale production equipment takes 2-3 times longer to deliver than normal equipment. In the case of ready-made equipment, the delivery period starts from 30 days. Excluding the time required for customs clearance of equipment in the territory of Uzbekistan, certification processes.
What are the shipping methods available?
According to the type of goods from abroad and the period when the order was received, the goods are delivered to the territory of Uzbekistan on the following basis: By air By rail By land transport By mixed transport
What is required of me to conclude a contract?
To become a client of our company, you must: CERTIFICATE certifying the business entity; Bank details; STIR number; Copy of the manager's passport; Enterprise seal to confirm the contract
Consultation

Let’s discuss your project together

Contact us for advice on choosing equipment, technical solutions and offers.

Call us+998 93 381 6699Mon–Sat: 9:00 – 18:00
AFEX · SOCIAL

Follow our channels

New equipment, commissioning and production footage — on our official channels.

Related equipment

View all