AFEX
Laser equipmentProduct code: AF-LA160100

Laser equipment AF-LA16*10

100W/150W/200W · 1,9LKw/h · 220v 50hz

Individual offer
Laser tube
100W/150W/200W
Power consumption
1,9LKw/h
Voltage
220v 50hz
operating speed (sharpening)
0-60000mm/min
Operating speed (cutting)
0-40000mm/min
Weight
370 Kg
Price
Request a quote

We prepare an individual offer for you

AFEX · CONSULTATION
Operators online

Quick price request

Leave your name and phone number — our specialist will take care of the rest.

EquipmentLaser equipment AF-LA16*10

Your data is never shared with third parties

Specifications

Data provided by the manufacturer; configuration may vary per order.

General

16 parameters
Ma+A1:B10nufacturer
China, Shenzhen
Work area
1600*1100mm
Power consumption
1,9LKw/h
Voltage
220v 50hz
operating speed (sharpening)
0-60000mm/min
Operating speed (cutting)
0-40000mm/min
software
RD works Ruida
Data transfer
USB2/USB3/WIFI
Motor type
Stepper motor
Possibility to lower the table
Available (can be removed)
Material
Black metal (painted)
Size
1160*1460*1930mm
Laser tube
100W/150W/200W (RECI brand)
Weight
370 Kg
Cooling chillers
CW5200
Standard additions
Cooling air motor, cooling chiller, lenses, air suction pipe, USB key, Operating software, USB cable, Power supply cable

Delivery and commissioning

From consultation to launch — four steps under contract.

  1. 1

    Consultation

    We define your needs, configure the line and prepare an offer.

  2. 2

    Contract

    Timeline, payment terms and warranty are fixed in the contract.

  3. 3

    Delivery

    The equipment is delivered from the manufacturer to your site.

  4. 4

    Installation and training

    Our specialists commission the equipment and train your operators.

Frequently asked questions

The most common questions about delivery, contracts and tracking.

Is it possible to track my orders online?
You can track orders online. Uzbekistan was one of the first to develop a mechanism for monitoring cargo, determining their location, and estimating the time of arrival using the GPS system. You can get this information only by entering the contract number.
How long will the shipments be delivered?
Delivery time depends on the manufacturer in most cases. Most large-scale production equipment takes 2-3 times longer to deliver than normal equipment. In the case of ready-made equipment, the delivery period starts from 30 days. Excluding the time required for customs clearance of equipment in the territory of Uzbekistan, certification processes.
What are the shipping methods available?
According to the type of goods from abroad and the period when the order was received, the goods are delivered to the territory of Uzbekistan on the following basis: By air By rail By land transport By mixed transport
What is required of me to conclude a contract?
To become a client of our company, you must: CERTIFICATE certifying the business entity; Bank details; STIR number; Copy of the manager's passport; Enterprise seal to confirm the contract
Consultation

Let’s discuss your project together

Contact us for advice on choosing equipment, technical solutions and offers.

Call us+998 93 381 6699Mon–Sat: 9:00 – 18:00
AFEX · SOCIAL

Follow our channels

New equipment, commissioning and production footage — on our official channels.

Related equipment

View all