AFEX

Equipment for the production of bath bombs

Bath bombs are flavored and foamy products designed to be added to water during bathing.

Individual offer
Power consumption
3.75 kw
Mold capacity
5.5cm x 10 pcs
Weight of equipment
450 kg
Lifting height of the press
300 mm
You're putting out the teligi press
68 mm/s
Desktop Area
450x350 mm
Price

Overview

About the equipment

Bath bombs are flavored and foamy products designed to be added to water during bathing. Once in the water, they dissolve, fill the bath with a pleasant aroma and color the water. Skin care moisturizers often contain oils, salts and vitamins that make the bath more fragrant and pleasant. The best way to turn an ordinary bath into a spa.

The production process

  1. Preparation of the powder
  2. Forming
  3. Pressing
  4. Extraction from the form
01

General

9 parameters
General
Manufacturer
China
Power consumption
3.75 kw
Pressing force
10 tons (max)
Lifting height of the press
300 mm (max)
Mold capacity
5.5cm x 10 pcs
You're putting out the teligi press
68 mm/s
Desktop Area
450x350 mm
The height of the desktop from the ground
850 mm
Weight of equipment
450 kg
The equipment has a shape for balls with a diameter of 5.5 cm, a shape of a different shape and size is made to order, the cost of the equipment may vary!
AFEX · CONSULTATION
Operators online

Quick price request

Leave your name and phone number — our specialist will take care of the rest.

EquipmentEquipment for the production of bath bombs

Your data is never shared with third parties

Specifications

Data provided by the manufacturer; configuration may vary per order.

General

9 parameters
Manufacturer
China
Power consumption
3.75 kw
Pressing force
10 tons (max)
Lifting height of the press
300 mm (max)
Mold capacity
5.5cm x 10 pcs
You're putting out the teligi press
68 mm/s
Desktop Area
450x350 mm
The height of the desktop from the ground
850 mm
Weight of equipment
450 kg

Video

The equipment in operation.

Delivery and commissioning

From consultation to launch — four steps under contract.

  1. 1

    Consultation

    We define your needs, configure the line and prepare an offer.

  2. 2

    Contract

    Timeline, payment terms and warranty are fixed in the contract.

  3. 3

    Delivery

    The equipment is delivered from the manufacturer to your site.

  4. 4

    Installation and training

    Our specialists commission the equipment and train your operators.

Frequently asked questions

The most common questions about delivery, contracts and tracking.

Is it possible to track my orders online?
You can track orders online. Uzbekistan was one of the first to develop a mechanism for monitoring cargo, determining their location, and estimating the time of arrival using the GPS system. You can get this information only by entering the contract number.
How long will the shipments be delivered?
Delivery time depends on the manufacturer in most cases. Most large-scale production equipment takes 2-3 times longer to deliver than normal equipment. In the case of ready-made equipment, the delivery period starts from 30 days. Excluding the time required for customs clearance of equipment in the territory of Uzbekistan, certification processes.
What are the shipping methods available?
According to the type of goods from abroad and the period when the order was received, the goods are delivered to the territory of Uzbekistan on the following basis: By air By rail By land transport By mixed transport
What is required of me to conclude a contract?
To become a client of our company, you must: CERTIFICATE certifying the business entity; Bank details; STIR number; Copy of the manager's passport; Enterprise seal to confirm the contract
Consultation

Let’s discuss your project together

Contact us for advice on choosing equipment, technical solutions and offers.

Call us+998 93 381 6699Mon–Sat: 9:00 – 18:00
AFEX · SOCIAL

Follow our channels

New equipment, commissioning and production footage — on our official channels.

Related equipment

View all