AFEX

Corn Stick (Puffed Corn Snack) Production Equipment

5.5KW · 400W · 800W

Individual offer
Main Motor Power
5.5KW
Cutting Power
400W
Heating Power
800W
Production Capacity
40 kg/hour
Voltage
380V
Equipment Dimensions
1200 × 900 × 1200 mm
Price

Overview

About the equipment

01

General

8 parameters
General
Voltage
380V
Main Motor Power
5.5KW
Cutting Power
400W
Feeding Power
400W
Heating Power
800W
Production Capacity
40 kg/hour
Equipment Dimensions
1200 × 900 × 1200 mm
Equipment Weight
280 kg

Equipment Molds

Machine Components

1️⃣ Automatic Feeding System

  • Adjustable-speed automatic feeding system ensures uniform raw material supply.

  • Eliminates manual inconsistencies and improves production stability.

2️⃣ Cutting Unit

  • The extruded material is precisely cut into small pieces using a special blade.

  • The length of the pieces can be freely adjusted by controlling the cutting speed.

3️⃣ Heating Device

  • Auxiliary heating system with constant temperature control speeds up the heating process.

  • Enhances the maturity and quality of the raw materials.

4️⃣ High-Power Motor

  • Provides strong power output for efficient operation.

  • Ensures high performance, durability, and long service life.

AFEX · CONSULTATION
Operators online

Quick price request

Leave your name and phone number — our specialist will take care of the rest.

EquipmentCorn Stick (Puffed Corn Snack) Production Equipment

Your data is never shared with third parties

Specifications

Data provided by the manufacturer; configuration may vary per order.

General

8 parameters
Voltage
380V
Main Motor Power
5.5KW
Cutting Power
400W
Feeding Power
400W
Heating Power
800W
Production Capacity
40 kg/hour
Equipment Dimensions
1200 × 900 × 1200 mm
Equipment Weight
280 kg

Video

The equipment in operation.

Delivery and commissioning

From consultation to launch — four steps under contract.

  1. 1

    Consultation

    We define your needs, configure the line and prepare an offer.

  2. 2

    Contract

    Timeline, payment terms and warranty are fixed in the contract.

  3. 3

    Delivery

    The equipment is delivered from the manufacturer to your site.

  4. 4

    Installation and training

    Our specialists commission the equipment and train your operators.

Frequently asked questions

The most common questions about delivery, contracts and tracking.

Is it possible to track my orders online?
You can track orders online. Uzbekistan was one of the first to develop a mechanism for monitoring cargo, determining their location, and estimating the time of arrival using the GPS system. You can get this information only by entering the contract number.
How long will the shipments be delivered?
Delivery time depends on the manufacturer in most cases. Most large-scale production equipment takes 2-3 times longer to deliver than normal equipment. In the case of ready-made equipment, the delivery period starts from 30 days. Excluding the time required for customs clearance of equipment in the territory of Uzbekistan, certification processes.
What are the shipping methods available?
According to the type of goods from abroad and the period when the order was received, the goods are delivered to the territory of Uzbekistan on the following basis: By air By rail By land transport By mixed transport
What is required of me to conclude a contract?
To become a client of our company, you must: CERTIFICATE certifying the business entity; Bank details; STIR number; Copy of the manager's passport; Enterprise seal to confirm the contract
Consultation

Let’s discuss your project together

Contact us for advice on choosing equipment, technical solutions and offers.

Call us+998 93 381 6699Mon–Sat: 9:00 – 18:00
AFEX · SOCIAL

Follow our channels

New equipment, commissioning and production footage — on our official channels.

Related equipment

View all