AFEX

3-head embroidery machine

The machine is equipped with 3 heads (needles), allowing it to print patterns on three different fabrics simultaneously.

Individual offer
Price

Overview

About the equipment

The machine is equipped with 3 heads (needles), allowing it to print patterns on three different fabrics simultaneously. This 3-head embroidery machine is available in 9-needle and 12-needle versions. You can choose the number of needles and obtain more information about it

Samples of finished products

Technical Specifications

  • Number of sewing heads: 3
  • Machine weight: 670 kg
  • Machine dimensions: 1960 x 1050 x 1730 mm
  • Pattern printing area: 400 x 500 mm
  • Materials used: Caps, t-shirts, cloth shoes, socks, pockets, and other clothing
  • Memory: 20,000,000 stitches, 200 patterns
  • Maximum color change: Automatic start and color change, 200 color changes preset
  • Readability: Compatible with designs from Tajima (DST), Barudan (DSB), and others
  • Design input: Transferred via U-disk, USB, or directly from the computer
  • Languages: 16 languages including Chinese, English, French, Russian, Dutch, Spanish, Portuguese, Turkish, German, Arabic, Thai, and Vietnamese

Complete accessory set:

  • 2 x 90mm round pattern printing frames
  • 2 x 120mm round pattern printing frames
  • 2 x 150mm round pattern printing frames
  • 2 x 200mm round pattern printing frames
  • 2 x 30x30mm round pattern printing frames
  • 1 x flat pattern printing frame
  • 2 x crown-shaped hoops
  • 1 x crown-shaped drive
Main motor: Servo motor XY motor: Stepper motor Control and computer system: 10-inch LCD screen Speed: Max. 1000 rpm Safety features: Emergency stop, protection against accidents, collision, bending, and other errors.

Additional accessories and spare parts:

Drive Block: 1 Needles: 10 Scissors: 1 Spring under the needle arm: 1 Needle movement spring: 1 Bobbin box: 3 Bobbins: 6 Inspection point: 1 Upper stationary part: 1 Round-headed cross M5x8: 6 Needle clamp, clamp screw: 1 set Needle rod, needle screws: 1 set Pedal: 1 U-disk: 1 Lower line test plate: 1 Nose plate: 1 Nose wire + lantern: 1 Circuit line electromagnet: 1 Adjustment switch 150-19: 1 Allen key: 1 set Phillips screwdriver: 1 Screwdriver: 1 Long-nose pliers: 1 Round frame - 90: 6 Round frame - 120: 6 Round frame - 150: 6 Round frame - 200: 6 Pattern box 290x290: 6 Flat frame: 1 Material tensioner - 200: 8 Material tensioner - 300: 6 Clothing attachment plate: 1 Headwear station: 1 set Winding machine: 1 Oil box: 1 Headwear ring: 6 Instruction manual: 1 Casters: 4 M8x30 Allen bolts: 16 Flat mat: 16 Washers: 16 Location hook screws: 4 Dustproof plate screws: 4 Long plate hook screws: 4 Needle board screws: 4 Needle plate (flat + embossed): 6 (3 + 3)
AFEX · CONSULTATION
Operators online

Quick price request

Leave your name and phone number — our specialist will take care of the rest.

Equipment3-head embroidery machine

Your data is never shared with third parties

Video

The equipment in operation.

Delivery and commissioning

From consultation to launch — four steps under contract.

  1. 1

    Consultation

    We define your needs, configure the line and prepare an offer.

  2. 2

    Contract

    Timeline, payment terms and warranty are fixed in the contract.

  3. 3

    Delivery

    The equipment is delivered from the manufacturer to your site.

  4. 4

    Installation and training

    Our specialists commission the equipment and train your operators.

Frequently asked questions

The most common questions about delivery, contracts and tracking.

Is it possible to track my orders online?
You can track orders online. Uzbekistan was one of the first to develop a mechanism for monitoring cargo, determining their location, and estimating the time of arrival using the GPS system. You can get this information only by entering the contract number.
How long will the shipments be delivered?
Delivery time depends on the manufacturer in most cases. Most large-scale production equipment takes 2-3 times longer to deliver than normal equipment. In the case of ready-made equipment, the delivery period starts from 30 days. Excluding the time required for customs clearance of equipment in the territory of Uzbekistan, certification processes.
What are the shipping methods available?
According to the type of goods from abroad and the period when the order was received, the goods are delivered to the territory of Uzbekistan on the following basis: By air By rail By land transport By mixed transport
What is required of me to conclude a contract?
To become a client of our company, you must: CERTIFICATE certifying the business entity; Bank details; STIR number; Copy of the manager's passport; Enterprise seal to confirm the contract
Consultation

Let’s discuss your project together

Contact us for advice on choosing equipment, technical solutions and offers.

Call us+998 93 381 6699Mon–Sat: 9:00 – 18:00
AFEX · SOCIAL

Follow our channels

New equipment, commissioning and production footage — on our official channels.

Related equipment

View all