AFEX
Oil equipmentProduct code: 60b1da6c0bd70c62c873af1e

Equipment for hydrothermal treatment of seed kernels (3 sections)

AFX COOKER 3P · 380V 50hz · 1140 kg

Individual offer
Model
AFX COOKER 3P
Voltage
380V 50hz
Weight
1140 kg
Electricity consumption
3kw/h
Par pressure
10 BAR
Size
1200*1200*2400mm
Price
AFEX · CONSULTATION
Operators online

Quick price request

Leave your name and phone number — our specialist will take care of the rest.

EquipmentEquipment for hydrothermal treatment of seed kernels (3 sections)

Your data is never shared with third parties

Specifications

Data provided by the manufacturer; configuration may vary per order.

Equipment for hydrothermal treatment of seed kernels (3 sections)

10 parameters
Manufacturer
China
Model
AFX COOKER 3P
Energy type
Electric
Voltage
380V 50hz
Electricity consumption
3kw/h
Weight
1140 kg
Par pressure
10 BAR (1 Mpa 100kg/h)
Size
1200*1200*2400mm
Material
Carbon metal
Heating method
Using Par

Delivery and commissioning

From consultation to launch — four steps under contract.

  1. 1

    Consultation

    We define your needs, configure the line and prepare an offer.

  2. 2

    Contract

    Timeline, payment terms and warranty are fixed in the contract.

  3. 3

    Delivery

    The equipment is delivered from the manufacturer to your site.

  4. 4

    Installation and training

    Our specialists commission the equipment and train your operators.

Frequently asked questions

The most common questions about delivery, contracts and tracking.

Is it possible to track my orders online?
You can track orders online. Uzbekistan was one of the first to develop a mechanism for monitoring cargo, determining their location, and estimating the time of arrival using the GPS system. You can get this information only by entering the contract number.
How long will the shipments be delivered?
Delivery time depends on the manufacturer in most cases. Most large-scale production equipment takes 2-3 times longer to deliver than normal equipment. In the case of ready-made equipment, the delivery period starts from 30 days. Excluding the time required for customs clearance of equipment in the territory of Uzbekistan, certification processes.
What are the shipping methods available?
According to the type of goods from abroad and the period when the order was received, the goods are delivered to the territory of Uzbekistan on the following basis: By air By rail By land transport By mixed transport
What is required of me to conclude a contract?
To become a client of our company, you must: CERTIFICATE certifying the business entity; Bank details; STIR number; Copy of the manager's passport; Enterprise seal to confirm the contract
Consultation

Let’s discuss your project together

Contact us for advice on choosing equipment, technical solutions and offers.

Call us+998 93 381 6699Mon–Sat: 9:00 – 18:00
AFEX · SOCIAL

Follow our channels

New equipment, commissioning and production footage — on our official channels.

Related equipment

View all