1 / 6Automatic corner cleaning equipment
1,1kw · 380v50hz · 200kg
Individual offer
- Power
- 1,1kw
- Voltage
- 380v50hz
- Weight
- 200kg
- Length
- 980mm
- Width
- 700mm
- Height
- 1450mm
Price
Overview
About the equipment
It is used for corner cleaning of PVC profiles after welding. Cleans the bottom, top and outer surfaces with 3 different blades
There is a pneumatic compression system
Operates under microcomputer control
01
9 parametersGeneral

- Weight
- 200kg
- Length
- 980mm
- Width
- 700mm
- Height
- 1450mm
- Power
- 1,1kw
- Voltage
- 380v50hz
- Air pressure
- 6bar]
- Air consumption
- 60l/min
- Management system
- Microcomputer

AFEX · CONSULTATION
Operators onlineQuick price request
Leave your name and phone number — our specialist will take care of the rest.
Your data is never shared with third parties
Specifications
Data provided by the manufacturer; configuration may vary per order.
General
9 parameters- Weight
- 200kg
- Length
- 980mm
- Width
- 700mm
- Height
- 1450mm
- Power
- 1,1kw
- Voltage
- 380v50hz
- Air pressure
- 6bar]
- Air consumption
- 60l/min
- Management system
- Microcomputer
Delivery and commissioning
From consultation to launch — four steps under contract.

Consultation
We define your needs, configure the line and prepare an offer.

Contract
Timeline, payment terms and warranty are fixed in the contract.

Delivery
The equipment is delivered from the manufacturer to your site.

Installation and training
Our specialists commission the equipment and train your operators.
Frequently asked questions
The most common questions about delivery, contracts and tracking.
Is it possible to track my orders online?
You can track orders online. Uzbekistan was one of the first to develop a mechanism for monitoring cargo, determining their location, and estimating the time of arrival using the GPS system. You can get this information only by entering the contract number.
How long will the shipments be delivered?
Delivery time depends on the manufacturer in most cases. Most large-scale production equipment takes 2-3 times longer to deliver than normal equipment. In the case of ready-made equipment, the delivery period starts from 30 days. Excluding the time required for customs clearance of equipment in the territory of Uzbekistan, certification processes.
What are the shipping methods available?
According to the type of goods from abroad and the period when the order was received, the goods are delivered to the territory of Uzbekistan on the following basis:
By air
By rail
By land transport
By mixed transport
What is required of me to conclude a contract?
To become a client of our company, you must:
CERTIFICATE certifying the business entity;
Bank details;
STIR number;
Copy of the manager's passport;
Enterprise seal to confirm the contract
Consultation
Let’s discuss your project together
Contact us for advice on choosing equipment, technical solutions and offers.
AFEX · SOCIAL
Follow our channels
New equipment, commissioning and production footage — on our official channels.
Related equipment

Window and frame production equipment
4-way window and frame welding equipment
Details →

Window and frame production equipment
Glass cutting equipment(AF-CM2026)
Details →

Window and frame production equipment
Glass painting equipment
Details →

Window and frame production equipment
Glass cutting equipment (AF-CNC 2400*1830mm)
Details →

Window and frame production equipment
Automatic conveyor
Details →

Window and frame production equipment
Two-way cnc corner cleaning equipment
Details →

Window and frame production equipment
Two-way corner cleaning equipment
Details →

Window and frame production equipment
Portable saw 350
Details →

