AFEX

Automatic 2 Line Wet Wipes Production Line (5-30 Pieces)

With this line, it is possible to produce moist towelettes in packs ranging from 5 pieces to 30 pieces.

Individual offer
Switching Power Supply
EDR-120-24 · Mingwei
Motion Controller
DVP-50MC11T · Delta
Temperature Module
DTE-10T · Delta
Inverter
MS300-400W · Delta
Servo Driver
B3-E-750W · Delta
Braking System
ECM-B3M-CA0807SS · Delta
Price

Overview

About the equipment

With this line, it is possible to produce moist towelettes in packs ranging from 5 pieces to 30 pieces. To date, it can be said without exaggeration that this type of moist towelette has become an essential companion for almost all women. Due to its convenience for carrying, this type of moist towelette is widely used during travel.

General Information about the Line

  • Required area: 50-70 square meters
  • Production capacity: 500 pieces/min, 50 packs/min (10 pieces per pack)
  • Energy type: Electricity
  • Voltage: 220V, 50Hz
  • Power consumption: 3.5 kW
  • Number of workers: 2 people
  • Water supply: Required
Moisturizing and Fragrance Solution Preparation Tank The process begins with the preparation of a special scented liquid, which is an essential step for moist towelettes. The majority of the liquid consists of filtered water and fragrance agents based on a special formula. The size of our liquid preparation tank is tailored to match your daily production volume. Any excess liquid left in the tank after use is returned back through a special pump. Manufactured: China City: Dongguan Voltage: 380V, 50Hz Power consumption: 4.5 kW/hour Product mixing section: Available Special stainless steel pump: Available Tank material: Stainless steel SS304 Equipment capacity: 400L Product weight: 240kg

2-row moist towelette forming and packaging equipment: From 5-pack to 30-pack per set

The equipment developed by AFEX GROUP and Chinese engineers is designed for moist towelettes in packs of 5 to 30 pieces and is recognized as a high-efficiency model. The machine can simultaneously accept two raw material rolls and consists of two cutting and forming heads, allowing for synchronous packaging and delivering finished packs.
  • Voltage: 220V, 50Hz
  • Power consumption: 3.5 kW/hour
  • Finished package size: Length: 100-200mm, Width: 30-100mm, Height: 5-50mm
  • Packaging film (roll) width: 100-230mm
  • Raw material intake width: 100-320mm
  • Packaging film: OPP / PE, PET / PE, OPP, aluminum-layered film, pure aluminum film, and other composite films
  • Raw material: Nonwoven fabric 30-90gsm
  • Machine operating speed: 500 pieces/min (50 packs/min with 10-piece packs)
  • Machine size: Length: 5675mm, Width: 1625mm, Height: 2185mm
  • Machine weight: 1000kg
  • PLC control panel

Packaging Section

Spare Parts for Equipment

01

Samples of Finished Products

32 parameters
Samples of Finished Products
Touch Screen
MT8102IQ · Weiluntong
Motion Controller
DVP-50MC11T · Delta
Expansion Module
DVP-04DA · Delta
Expansion Module
DVP-16SP · Delta
Temperature Module
DTE-10T · Delta
Switching Power Supply
EDR-120-24 · Mingwei
Inverter
MS300-400W · Delta
Servo Driver
B3-E-750W · Delta
Servo Driver
B3-E-400W · Delta
Servo Driver
ECM-B3M-C20807RS1 · Delta
Servo Driver
ECM-B3M-C20604RS1 · Delta
Braking System
ECM-B3M-CA0807SS · Delta
Source Value
ECM-B3M-CA0604RS1 · Delta
Photo Sensor
HT5.1/2 NPN · Ease
Transmissive Photo Sensor
GX-1112MKA · Matsushita
Colored Label Sensor
LX101 · Matsushita
Relay
RXM2LB2BD · Schneider
Phase Sequence Protector
XJ3-G · Zhengtai
Socket
AC30-10540 · Zhengtai
AC Contactor
LC1N3210M5N 32A 220V · Schneider
Circuit Breaker
C40-4P · Schneider
Circuit Breaker
C25-2P · Schneider
Circuit Breaker
C16-2P · Schneider
Circuit Breaker
C16-1P · Schneider
Circuit Breaker
C10-1P · Schneider
Relay
40A · Toky
Regulator
SCR-40LA · Yang
Sensor
RS485-24V-15bit · Ruilei
Button
Urgent Stop (NO) · Schneider
Button
Red (NO) · Schneider
Button
Green (NO) · Schneider
Button
Huang (NO) · Schneider

Video from the workplace

AFEX · CONSULTATION
Operators online

Quick price request

Leave your name and phone number — our specialist will take care of the rest.

EquipmentAutomatic 2 Line Wet Wipes Production Line (5-30 Pieces)

Your data is never shared with third parties

Specifications

Data provided by the manufacturer; configuration may vary per order.

Samples of Finished Products

32 parameters
Touch Screen
MT8102IQ · Weiluntong
Motion Controller
DVP-50MC11T · Delta
Expansion Module
DVP-04DA · Delta
Expansion Module
DVP-16SP · Delta
Temperature Module
DTE-10T · Delta
Switching Power Supply
EDR-120-24 · Mingwei
Inverter
MS300-400W · Delta
Servo Driver
B3-E-750W · Delta
Servo Driver
B3-E-400W · Delta
Servo Driver
ECM-B3M-C20807RS1 · Delta
Servo Driver
ECM-B3M-C20604RS1 · Delta
Braking System
ECM-B3M-CA0807SS · Delta
Source Value
ECM-B3M-CA0604RS1 · Delta
Photo Sensor
HT5.1/2 NPN · Ease
Transmissive Photo Sensor
GX-1112MKA · Matsushita
Colored Label Sensor
LX101 · Matsushita
Relay
RXM2LB2BD · Schneider
Phase Sequence Protector
XJ3-G · Zhengtai
Socket
AC30-10540 · Zhengtai
AC Contactor
LC1N3210M5N 32A 220V · Schneider
Circuit Breaker
C40-4P · Schneider
Circuit Breaker
C25-2P · Schneider
Circuit Breaker
C16-2P · Schneider
Circuit Breaker
C16-1P · Schneider
Circuit Breaker
C10-1P · Schneider
Relay
40A · Toky
Regulator
SCR-40LA · Yang
Sensor
RS485-24V-15bit · Ruilei
Button
Urgent Stop (NO) · Schneider
Button
Red (NO) · Schneider
Button
Green (NO) · Schneider
Button
Huang (NO) · Schneider

Video

The equipment in operation.

Delivery and commissioning

From consultation to launch — four steps under contract.

  1. 1

    Consultation

    We define your needs, configure the line and prepare an offer.

  2. 2

    Contract

    Timeline, payment terms and warranty are fixed in the contract.

  3. 3

    Delivery

    The equipment is delivered from the manufacturer to your site.

  4. 4

    Installation and training

    Our specialists commission the equipment and train your operators.

Frequently asked questions

The most common questions about delivery, contracts and tracking.

Is it possible to track my orders online?
You can track orders online. Uzbekistan was one of the first to develop a mechanism for monitoring cargo, determining their location, and estimating the time of arrival using the GPS system. You can get this information only by entering the contract number.
How long will the shipments be delivered?
Delivery time depends on the manufacturer in most cases. Most large-scale production equipment takes 2-3 times longer to deliver than normal equipment. In the case of ready-made equipment, the delivery period starts from 30 days. Excluding the time required for customs clearance of equipment in the territory of Uzbekistan, certification processes.
What are the shipping methods available?
According to the type of goods from abroad and the period when the order was received, the goods are delivered to the territory of Uzbekistan on the following basis: By air By rail By land transport By mixed transport
What is required of me to conclude a contract?
To become a client of our company, you must: CERTIFICATE certifying the business entity; Bank details; STIR number; Copy of the manager's passport; Enterprise seal to confirm the contract
Consultation

Let’s discuss your project together

Contact us for advice on choosing equipment, technical solutions and offers.

Call us+998 93 381 6699Mon–Sat: 9:00 – 18:00
AFEX · SOCIAL

Follow our channels

New equipment, commissioning and production footage — on our official channels.

Related equipment

View all