AFEX
Oil equipmentProduct code: 60b1e44e0bd70c4ac56cf62a

Oil UF sterilization equipment

It is advisable to sterilize the oil before packaging.

Individual offer
Power consumption
500 w/h
Voltage
220v 50hz
Weight
30 kg
Production volume
500 L/h
Material
304 ss
Operating temperature
5-60 C
Price

Overview

About the equipment

It is advisable to sterilize the oil before packaging. Before packaging in the cooled state, it is directed to the packaging equipment in a state that has passed through the sterilization section.

01

General

7 parameters
General
Produced
China
Voltage
220v 50hz
Power consumption
500 w/h
Material
304 ss
Weight
30 kg
Production volume
500 L/h
Operating temperature
5-60 C
AFEX · CONSULTATION
Operators online

Quick price request

Leave your name and phone number — our specialist will take care of the rest.

EquipmentOil UF sterilization equipment

Your data is never shared with third parties

Specifications

Data provided by the manufacturer; configuration may vary per order.

General

7 parameters
Produced
China
Voltage
220v 50hz
Power consumption
500 w/h
Material
304 ss
Weight
30 kg
Production volume
500 L/h
Operating temperature
5-60 C

Delivery and commissioning

From consultation to launch — four steps under contract.

  1. 1

    Consultation

    We define your needs, configure the line and prepare an offer.

  2. 2

    Contract

    Timeline, payment terms and warranty are fixed in the contract.

  3. 3

    Delivery

    The equipment is delivered from the manufacturer to your site.

  4. 4

    Installation and training

    Our specialists commission the equipment and train your operators.

Frequently asked questions

The most common questions about delivery, contracts and tracking.

Is it possible to track my orders online?
You can track orders online. Uzbekistan was one of the first to develop a mechanism for monitoring cargo, determining their location, and estimating the time of arrival using the GPS system. You can get this information only by entering the contract number.
How long will the shipments be delivered?
Delivery time depends on the manufacturer in most cases. Most large-scale production equipment takes 2-3 times longer to deliver than normal equipment. In the case of ready-made equipment, the delivery period starts from 30 days. Excluding the time required for customs clearance of equipment in the territory of Uzbekistan, certification processes.
What are the shipping methods available?
According to the type of goods from abroad and the period when the order was received, the goods are delivered to the territory of Uzbekistan on the following basis: By air By rail By land transport By mixed transport
What is required of me to conclude a contract?
To become a client of our company, you must: CERTIFICATE certifying the business entity; Bank details; STIR number; Copy of the manager's passport; Enterprise seal to confirm the contract
Consultation

Let’s discuss your project together

Contact us for advice on choosing equipment, technical solutions and offers.

Call us+998 93 381 6699Mon–Sat: 9:00 – 18:00
AFEX · SOCIAL

Follow our channels

New equipment, commissioning and production footage — on our official channels.

Related equipment

View all