AFEX

High-Temperature Muffle Furnace AF-8/10TP

8-10T/TP · 8 kW · 36 L

Individual offer
Model
8-10T/TP
Power
8 kW
Rated capacity
36 L
Overall dimensions (W×D×H, mm)
700×860×860
Heating-up time
<30 min
Chamber size (W×D×H, mm)
300×400×300
Price

Overview

Key advantages

  • One-piece housing design, multiple parameters shown on a large LCD screen, convenient operation and modern appearance
  • High-precision PID temperature control with no energy loss
  • Imported HRE high-temperature-resistant alloy heating element: long service life and energy efficiency
  • Short heating-up time: from room temperature to 1000°C in less than 30 minutes
  • Several temperature controllers available for the customer to choose from

About the equipment

After switching to holding mode, temperature fluctuation is very small (temperature accuracy ±1°C, temperature uniformity ±5°C). P-type multi-segment multifunctional temperature controller; heating and cooling rates can be preset.

01

Technical specifications

7 parameters
Technical specifications
Model
8-10T/TP
Power
8 kW
Heating-up time
RT+10–1000 (<30 min)
Heating element type
Resistance wire
Chamber size (W×D×H, mm)
300×400×300
Overall dimensions (W×D×H, mm)
700×860×860
Rated capacity
36 L
AFEX · CONSULTATION
Operators online

Quick price request

Leave your name and phone number — our specialist will take care of the rest.

EquipmentHigh-Temperature Muffle Furnace AF-8/10TP

Your data is never shared with third parties

Specifications

Data provided by the manufacturer; configuration may vary per order.

Technical specifications

7 parameters
Model
8-10T/TP
Power
8 kW
Heating-up time
RT+10–1000 (<30 min)
Heating element type
Resistance wire
Chamber size (W×D×H, mm)
300×400×300
Overall dimensions (W×D×H, mm)
700×860×860
Rated capacity
36 L

Delivery and commissioning

From consultation to launch — four steps under contract.

  1. 1

    Consultation

    We define your needs, configure the line and prepare an offer.

  2. 2

    Contract

    Timeline, payment terms and warranty are fixed in the contract.

  3. 3

    Delivery

    The equipment is delivered from the manufacturer to your site.

  4. 4

    Installation and training

    Our specialists commission the equipment and train your operators.

Frequently asked questions

The most common questions about delivery, contracts and tracking.

Is it possible to track my orders online?
You can track orders online. Uzbekistan was one of the first to develop a mechanism for monitoring cargo, determining their location, and estimating the time of arrival using the GPS system. You can get this information only by entering the contract number.
How long will the shipments be delivered?
Delivery time depends on the manufacturer in most cases. Most large-scale production equipment takes 2-3 times longer to deliver than normal equipment. In the case of ready-made equipment, the delivery period starts from 30 days. Excluding the time required for customs clearance of equipment in the territory of Uzbekistan, certification processes.
What are the shipping methods available?
According to the type of goods from abroad and the period when the order was received, the goods are delivered to the territory of Uzbekistan on the following basis: By air By rail By land transport By mixed transport
What is required of me to conclude a contract?
To become a client of our company, you must: CERTIFICATE certifying the business entity; Bank details; STIR number; Copy of the manager's passport; Enterprise seal to confirm the contract
Consultation

Let’s discuss your project together

Contact us for advice on choosing equipment, technical solutions and offers.

Call us+998 93 381 6699Mon–Sat: 9:00 – 18:00
AFEX · SOCIAL

Follow our channels

New equipment, commissioning and production footage — on our official channels.